A project carried out in 2005 to construct a new front entrance, a customs building, and a passenger walkway extension to the new terminal. The low pitched roofing comprised of a structural metal decking with Keybemo Limited built-up aluminium standing seam system, and the wall cladding was horizontally fixed composite panel.