A project carried out in 2006 to improve the appearance of an office block in central London. The cladding system used was of a flat composite material supplied by Kingspan Limited with integrated windows, all supported on secondary steelwork connected to the existing structure. The flat roofs were overlaid with a torch-on felt roofing system.